API 5CT 7-5/8" L80 BTC/LTC Eccentric Multiple Flank Jets Aluminum Alloy Float Shoe for Cementing Tool
Basic Properties
Place of Origin:
Jiangsu, Κίνα
Brand Name:
SWS
Certification:
API ISO
Trading Properties
Minimum Order Quantity:
1
Price:
$20
Specifications
| Weight: | 3 kg | Core Components: | Βαλβίδα |
| Valve Type: | Μία βαλβίδα & διπλή βαλβίδα | Processing Type: | Σφυρηλάτηση |
| Size: | Τυπικό μέγεθος | Bore O.D.: | 7 5/8" |
| Bore I.D.: | 6 1/4 ίντσες | Min Bore: | 2 3/8» |
| Thread Type: | 7 "LCSG | Pressure Rating: | 3626 lb/in² |
| Material: | Κράμα αργιλίου | Product Type: | παπούτσι πλεύσης |
| Connection Type: | Κεφαλαιαγορά | Flange Type: | Εκκεντρική πολλαπλή πλευρά |
| Standard: | API 5CT | ||
| High Light: | 7-5/8" Float Shoe,New Product 2024 Float Shoe,BTC/LTC Float Shoe |
||
Περιγραφή προϊόντων
API 5CT 7-5/8" L80 BTC/LTC Eccentric Multiple Flank Jets Aluminum Alloy Float Shoe
Product Specifications
| Name | Size(in) | Bore O.D.(in) | Bore I.D.(in) | Min Bore Parameter(in) | Thread Type | lb(in2) |
|---|---|---|---|---|---|---|
| Float Collar | 5 1/2" | 6" | 4 3/4" | 2" | 5 1/2" LCSG | 4351 |
| 7" | 7 5/8" | 6 1/4" | 2 3/8" | 7" LCSG | 3626 | |
| 9 5/8" | 10 5/8" | 8 5/8" | 2 3/8" | 9 5/8" LCSG | 3626 | |
| 13 3/8" | 14 3/8" | 12 3/8" | 2 3/8" | 13 3/8" LCSG | 3626 | |
| Float Shoe | 5 1/2" | 6" | 4 3/4" | 2" | 5 1/2" LCSG | 4351 |
| 7" | 7 5/8" | 6 1/4" | 2 3/8" | 7" LCSG | 3626 | |
| 9 5/8" | 10 5/8" | 8 5/8" | 2 3/8" | 9 5/8" LCSG | 3626 | |
| 13 3/8" | 14 3/8" | 12 3/8" | 2 3/8" | 13 3/8" LCSG | 3626 |
Frequently Asked Questions
Q1: When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please tell us in your email so that we will regard your inquiry priority.
Q2: Could I have prices of your products?
A: Welcome. Please feel free to send us an email here. You will get our reply in 24 hours.
Q3: Can I get a lower price if I order large quantities?
A: Yes, cheaper prices with more bigger quantity orders.
Q4: Do you inspect the finished products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping.
Q5: What about the lead time for the mass production?
A: Honestly, it depends on the order quantity and the season you place the order.
Company Information
Certifications